Measure one straight constant-height wall
Enter the wall length, exposed height and any buried block height specified for the project. Enter the actual block face length and installed course height from the manufacturer. Curves, corners and stepped grades need separate sections or a supplier takeoff.
Courses, positions, allowance and caps
Courses = round up((exposed height + buried height) ÷ block course height). Positions per course = round up(wall length ÷ block face length). Wall blocks = round up(courses × positions × (1 + allowance)). Caps are counted separately from wall length and cap face length, then receive the same editable allowance.
Base and drainage aggregate planning
Compacted base volume = wall length × base width × base depth. Drainage volume = wall length × total wall height × drainage thickness. Each volume is multiplied by your loose-delivery/compaction allowance. CMHA notes that leveling-pad and drainage details depend on site conditions and the wall designer; the entered dimensions are project inputs, not design recommendations.
Independent check example
A 20 ft wall with 3 ft exposed and 0.5 ft buried height uses seven 6 in courses. Twelve-inch blocks give 20 positions per course, or 140 before allowance; 10% gives 154 wall blocks. Twenty cap positions become 22 caps. At 3.50 per block and 4.25 per cap, cost is 632.50. A 24 in × 6 in base plus 12 in drainage zone, both with 20% loose allowance, total exactly 4 yd³.
Assumptions, safety limits and sources
This is a materials estimate, not a structural, geotechnical, drainage, permit or code design. Confirm embedment, setback, geogrid, soil, surcharge, frost, drainage outlet and wall-height limits with the manufacturer and qualified project professional. Installation context: CMHA Segmental Retaining Wall Installation Guide.